Sign up FAST! Login

California's High-Speed Rail is on!


Stashed in: California, Trains!

To save this post, select a stash from drop-down menu or type in a new one:

Can't wait!!

Earlier this spring, high-speed rail in California took two very significant steps. First Bay Area leaders announced a plan to electrify Caltrain, which would make it possible for Caltrain and high-speed rail to share the same tracks between San Jose and San Francisco. Second the California High-Speed Rail Authority released an updated business plan that cuts the cost of the train system by a third.

The new business plan (download the official summary here) still assumes an electrified train system that will travel between San Francisco and Los Angeles in 2 hours and 40 minutes (at 220 m.p.h.) and will operate without any ongoing subsidy.

I really want to ride on this train.

cm-5138-04f9a0747e8325.jpeg

You May Also Like: